Project General Accounts are costs occurred on a project to facilitate construction. These costs are typically for items built into the building or site development which will not be left behind, or are part of the finished product. These costs can also be described as project overhead costs and temporary facilities.
-
Material costs for the supply only of items purchased under a cash allowance...
-
Contingency Allowances on projects are specified to cover the cost of changes in the work.
-
The costs associated with providing Performance and/or Labour Material Payment Bond for a project.
-
The cost of premiums for Builders Risk and General Liability insurance on a Project.
-
The premiums or interest charges for refundable or non-refundable deposits as outlined in the contract.
-
Labour, materials, equipment or an Ontario Land Surveyor to perform building lay-out, curb lay-out, or general lines levels, etc.
-
The costs associated with a Ontario Land Surveyor to perform initial property corners, foundation certification, final grading certification, as specified in the contract documents.
-
The cost levied by the municipality for building permits, development levies, Site Plan Approval Fee’s, and Provincial Ministry Fee’s.
-
The costs associated with publication of Substantial Performance, legal fees for registration of Lien’s etc, or legal advice on project matters.
-
The costs charged by Utilities or Municipalities for connection to their services to the building.
-
The cost associated with supervising the work by the supervisor in charge of the project.
-
The cost of travel allowance paid to an employee, in accordance with company policy for travel to the project.
-
The costs of hotel accommodation and meal allowances for work outside of our regular area.
-
The costs associated with time spent on preparing drawings for construction.
-
The costs associated with in-house photographs or professional photography as maybe required by the contract documents.
-
The cost occurred from the services of an independent inspection and testing company.
-
The cost associated with the delivery or pick-up of our office trailers to the jobsite.
-
The cost of temporary toilets rented, cleaning and maintenance of permanent washrooms used for construction personnel.
-
Costs include: Charges for connection and disconnection to an existing hydro service.
-
Connection of land lines to job site trailer, telephone usage, cell phones, portable radios, and fax machines.
-
Temporary connection to existing water service or the costs associated with providing a temporary service.
-
Costs occurred to heat the building interior for all trades.
-
Costs of labour, materials and equipment provide heat and temporary protection for foundations and masonry.
-
Purchase of equipment and materials required for safety.
-
Materials, equipment and labour for the installation and removal of: Snow Fencing, Wood Hoarding, Dust Barriers, etc.
-
Costs associated with providing security services to a project after regular working hours.
-
Equipment, materials and labour for the installation, maintenance and removal of temporary roads to access a site.
-
Costs to purchase blades or sharpen blades, Minor tool purchase where it is job specific.
-
Labour and trucking for delivery of material or equipment from our shop to the jobsite, and the return of the same back to the shop.
-
The cost associated with the labour, material and equipment for temporary signage on a project.
-
Labour, equipment, material and dumpster fee's for general cleanup of the site during the construction.
-
Labour, equipment, and materials, or a cleaning service to final clean the site and building for inspection or occupancy by the Owner.
-
The labour, materials, and equipment cost associated to doing work for repairs under warranty on a given project.