Tillsonburg, Ontario · Est. 1997

Join our bid list

Get invited to future tenders.

Tell us what you do and we'll send you the tenders that match. We solicit competitive bids from trusted trades and suppliers on every project.

Company
Company representative
What do you do? Choose at least one cost code

Search by number or keyword, expand a division, or tick a whole division at once. Hover a code to read its description.

0 selected

DIVISION 1 - GENERAL ACCOUNTS 0/33

Project General Accounts are costs occurred on a project to facilitate construction. These costs are typically for items built into the building or site development which will not be left behind, or are part of the finished product. These costs can also be described as project overhead costs and temporary facilities.

  • Material costs for the supply only of items purchased under a cash allowance...
  • Contingency Allowances on projects are specified to cover the cost of changes in the work.
  • The costs associated with providing Performance and/or Labour Material Payment Bond for a project.
  • The cost of premiums for Builders Risk and General Liability insurance on a Project.
  • The premiums or interest charges for refundable or non-refundable deposits as outlined in the contract.
  • Labour, materials, equipment or an Ontario Land Surveyor to perform building lay-out, curb lay-out, or general lines levels, etc.
  • The costs associated with a Ontario Land Surveyor to perform initial property corners, foundation certification, final grading certification, as specified in the contract documents.
  • The cost levied by the municipality for building permits, development levies, Site Plan Approval Fee’s, and Provincial Ministry Fee’s.
  • The costs associated with publication of Substantial Performance, legal fees for registration of Lien’s etc, or legal advice on project matters.
  • The costs charged by Utilities or Municipalities for connection to their services to the building.
  • The cost associated with supervising the work by the supervisor in charge of the project.
  • The cost of travel allowance paid to an employee, in accordance with company policy for travel to the project.
  • The costs of hotel accommodation and meal allowances for work outside of our regular area.
  • The costs associated with time spent on preparing drawings for construction.
  • The costs associated with in-house photographs or professional photography as maybe required by the contract documents.
  • The cost occurred from the services of an independent inspection and testing company.
  • The cost associated with the delivery or pick-up of our office trailers to the jobsite.
  • The cost of temporary toilets rented, cleaning and maintenance of permanent washrooms used for construction personnel.
  • Costs include: Charges for connection and disconnection to an existing hydro service.
  • Connection of land lines to job site trailer, telephone usage, cell phones, portable radios, and fax machines.
  • Temporary connection to existing water service or the costs associated with providing a temporary service.
  • Costs occurred to heat the building interior for all trades.
  • Costs of labour, materials and equipment provide heat and temporary protection for foundations and masonry.
  • Purchase of equipment and materials required for safety.
  • Materials, equipment and labour for the installation and removal of: Snow Fencing, Wood Hoarding, Dust Barriers, etc.
  • Costs associated with providing security services to a project after regular working hours.
  • Equipment, materials and labour for the installation, maintenance and removal of temporary roads to access a site.
  • Costs to purchase blades or sharpen blades, Minor tool purchase where it is job specific.
  • Labour and trucking for delivery of material or equipment from our shop to the jobsite, and the return of the same back to the shop.
  • The cost associated with the labour, material and equipment for temporary signage on a project.
  • Labour, equipment, material and dumpster fee's for general cleanup of the site during the construction.
  • Labour, equipment, and materials, or a cleaning service to final clean the site and building for inspection or occupancy by the Owner.
  • The labour, materials, and equipment cost associated to doing work for repairs under warranty on a given project.
DIVISION 2 - DEMOLITION AND SITEWORK 0/13
  • The costs associated with complete demolition of a structure of building.
  • Labour, materials, and equipment required for selective demolition of portions of a building.
  • The cost associated with temporary dewatering of excavations.
  • General includes the cost of site removals, excavation and backfill, grading, storm and sanitary sewers and water main.
  • Cost of sub-contractor to perform caissons or piles, or other type of special foundations.
  • Cost of subcontractor to perform shoring or sheet piling of excavations.
  • The costs of a landscape subcontractor for the scope of work included in his contract.
  • The labour, material, or subcontract cost for installation, or modification to an in-ground lawn sprinkler systems.
  • The costs associated with chain link, ornamental iron, wood fencing, and hi-way type guardrails.
  • The labour, material, or subcontract cost for asphalt paving and line painting.
  • The subcontract cost to do pavement markings for parking stalls, handicap symbols, arrows, etc.
  • The material, labour, equipment, or subcontract cost to install cast-in-place or precast concrete curbs and concrete sidewalks.
  • The material, labour, equipment, or subcontract cost to install items such as: Parking, Fire Route signs, etc.
DIVISION 3 - CONCRETE 0/7
  • Cost includes all labour, materials, equipment, hoisting, and subcontractors to perform cast-in-place concrete.
  • The supply and installation of reinforcing steel, including equipment to unload or hoist rebar into place.
  • Cost to finish slabs, including labour, materials, equipment, and subcontractors.
  • Labour, material, equipment, and subcontract cost to perform cementitious self-leveling underlayment.
  • Supply and installation of architectural precast panels typically used as wall cladding.
  • The supply and installation of ornamental precast.
  • The supply and installation of structural precast. Items such as hollow core slabs, double ‘T’s, Tilt-up panels, etc.
DIVISION 4 - UNIT MASONRY 0/2
  • Labour, material, equipment, and subcontract cost to perform unit masonry on a project.
  • The costs associated with restoring existing masonry.
DIVISION 5 - METALS 0/3
  • The costs associated with the supply and erection of structural steel items such as: Columns, beams, bridging, and joists.
  • Includes the cost to supply and install metal roof or floor deck.
  • The supply and/or the installation of miscellaneous metal fabrications.
DIVISION 6 - WOOD 0/6
  • The cost of rough carpentry items not to view in finished building.
  • The labour, equipment, and hoisting costs to erect wood framed buildings.
  • The cost associated with the supply of pre-engineered wood systems.
  • The labour, material, equipment cost associated with loose items, site built, left exposed in the finished building.
  • The cost for supply and installation of cabinets, vanities, display cases and other shop built wood fabrications.
  • The labour, material, and equipment cost to supply and install wood stairs and handrails.
DIVISION 7 - THERMAL AND MOISTURE PROTECTION 0/12
  • Cost to supply and install waterproofing and damppoofing systems.
  • Cost to supply and install air barrier systems.
  • The labour, material, and equipment cost to supply and install insulation to miscellaneous areas.
  • The cost of sprayed and blown applied insulation.
  • The cost to apply sprayed fireproofing materials.
  • Labour, material, and subcontract cost to install metal roofing systems.
  • The cost of labour, material, and equipment for the installation of eaves trough, fascia, soffit, etc.
  • The cost to provide exterior panel systems, including materials, equipment, labour, and sub-trades.
  • The labour, material, and subcontract cost to install flat roofing systems.
  • Labour, material, and equipment cost to install asphalt, slate, and synthetic roofing systems.
  • The material and labour cost to install miscellaneous caulking.
  • The cost for the installation of firestopping systems.
DIVISION 8 - DOORS AND WINDOWS 0/10
  • The labour, material and accessory costs to supply and install metal doors and frames.
  • The cost to supply and install wood doors.
  • Cost to install overhead doors, including operators and controls.
  • Cost to supply and install such items as cooler, vault, and revolving doors.
  • Cost to supply and install aluminum entrances, windows, curtain wall, and related glazing.
  • Cost to supply and install residential type windows.
  • Cost for the supply and installation of handicap door operators.
  • Cost for the supply and installation of skylights.
  • Labour and material cost for supply and installation of finished hardware.
  • Labour and material cost for the supply and installation of glass to doors or interior screens.
DIVISION 9 - FINISHES 0/7
  • The cost to install partitions, bulkheads and ceilings.
  • The cost for flooring, types include ceramic, quarry, resilient, terrazzo and carpet.
  • The cost for site set terrazzo flooring, or precast terrazzo stair treads.
  • The cost of special flooring, such as resilient or wood sports flooring.
  • The supply and installation of stucco. Includes synthetic systems such as Dryvit.
  • The cost associated with painting and wall coverings on a project.
  • The cost associated with the supply and installation of special coatings.
DIVISION 10 - SPECIALTIES 0/1
  • The cost associated with the supply and installation of miscellaneous specialties as specified.
DIVISION 11 - EQUIPMENT 0/1
  • The cost associated with the supply and installation of equipment.
DIVISION 12 - FURNISHINGS 0/1
  • The cost associated with items such as: Draperies and Blinds, Operable or Fixed Seating, etc.
DIVISION 13 - SPECIAL CONSTRUCTION 0/2
  • The cost associated with items such as: Pre-Engineered Structures, Greenhouses, Swimming Pools, etc.
  • The cost associated with the supply and installation of Refrigeration or Cooler panels.
DIVISION 14 - ELEVATING DEVICES 0/1
  • The cost associated with: Escalators, Elevators, Handicap Lifts, etc.
DIVISION 15 - MECHANICAL SYSTEMS 0/2
  • The cost associated with the mechanical systems installed in a building.
  • The cost associated with fire suppression systems.
DIVISION 16 - ELECTRICAL SYSTEMS 0/1
  • The cost associated with the electrical systems installed in a building.

We use these details only to invite you to tenders. Nothing is shared.